We passed final inspection with three notes. (The inspector asked me if I trust the company enough to finish after he leaves. I said yes–they’ve been great by me.) They had to attach the gutter downspouts to the house and they needed to change the messed up spout for the front yard hose. Everything else is golden.
They sealed the rest of my bedroom and replaced the moldy board. They are done in that room. I just have to paint.
Because the downspouts weren’t done I ran to Home Depot and got rain barrels. I’m so excited. I’ve wanted them for years.
Definitely feeling better without Lamictal.