So it goes

AllĀ four showers in the house are jacked up and need repair. That’s pissing me off. The boiler system needs to be replaced. Most of the sinks are draining slow and need to be snaked. So basically, all the plumbing is shit.

Slowly fixing all the electrical shit that’s fucked up.

I’m pretty annoyed about just how much needs to be fixed. And how expensive it is.

Don’t know the results of the biopsy on the melanoma. Results are being snail mailed from the US.

We are working on our diet to be more centered on general cancer prevention though. That’s going to matter if I want to be here for decades.

Working on the book already. Why bother waiting for November? I’m not shooting for 50,000 anyway. I think this will be over 100,000. I have a lot to say to the kids. It hurts.

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.